hit counter script

Send Test Report - Bosch B9512G Program Entry Manual

Security system
Hide thumbs Also See for B9512G:
Table of Contents

Advertisement

Control Panel
The status report can be deferred if any other report was sent since the last status report. To
defer the status report for up to 24 hours, set the Parameter 1: Deferred option to Yes.
11.5.28

Send Test Report

This sked function emulates the Test Report keypad function. This function generates a test
report from Area 1 that includes panel wide status information. The report is sent based on
the Report Routing configuration under Panel Wide Parameters > Report Routing > Test
Reports > Test Reports, page 54.
If Expand Test Report, page 30 in Panel Wide > Phone and Phone Parameters is programmed
Yes, the test report also includes all off-normal states for events listed in Panel Wide
Parameters > Report Routing >  Diagnostic Reports, page 54 and Test Reports.
Selections, Parameter 1: Deferred
Notice!
Only sending the test report is deferred
When Parameter 1: Deferred is set to Yes, only sending the test report is deferred. The Send
Test Report sked still runs at the frequency set in Parameter 2: Frequency.
Selections, Parameter 2: Frequency
Deferring test reports
When Parameter 1: Deferred is set to Yes, the control panel starts (or restarts) a 24 hour
countdown timer each time it receives an Ack (acknowledgement) from the central station
receiver for any report.
If Parameter 2 is set to Hourly, and the panel has not received an Ack by the time the first
hourly Send Test Report sked runs, the panel sends the test report. If the panel received an
Ack, test reports are deferred for 24 hours from the last Ack received. The hourly Send Test
Report sked will not send a test report for at least 24 hours.
If Parameter 2 is set to Monthly, and the panel has not received an Ack within 24 hours of the
time the first monthly Send Test Report sked runs, the panel sends the test report. If the
panel receives an Ack within 24 hours of the time a monthly Send Test Report sked is set to
run, the test report is deferred for 24 hours from the last Ack received. If the 24 hour
countdown timer expires, the panel sends the deferred test report at that time.
If Parameter 2 is set to Scheduled, and the panel has not received an Ack within 24 hours of
the time the scheduled Send Test Report sked runs, the panel sends the test report. If the
panel receives an Ack within 24 hours of the time a scheduled Send Test Report sked is set to
run, the test report is deferred for 24 hours from the last Ack received. If the 24 hour
countdown timer expires, the panel the deferred test report at that time.
Bosch Security Systems, Inc.
Yes - defer sending test reports for 24 hours if any other report is sent.
No - do not defer sending test reports.
Hourly - The first Send Test Report sked runs at the time entered in the Time parameter
for the Sked. The Send Test Report sked runs every hour after that.
Monthly - The first Send Test Report sked runs at the time entered in the Time parameter
for the sked, on the date entered in the Date parameter. The Send Test Report sked runs
every month after that.
Scheduled - The Send Test Report sked runs annually on the date entered in Date
parameter, at the time entered in the Time parameter.
Program Entry Guide
Schedules | en 223
2017.03 | 09 | F.01U.303.998

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

B8512gB8512g-eB9512g-e

Table of Contents

Save PDF