NOTICE:
▶ Upon completion of the installation, these instructions should be
handed to the owner and operator of the appliance.
▶ The installer must instruct the owner and operator on the functionality
of the components and the proper operation of the boiler and the
heating system.
▶ The boiler must be serviced annually including the main burner,
ignition burner, the entire venting system, and the combustion air
supply. All parts that show any signs of damage or corrosion must be
replaced.
Fig. 1 Scope of delivery heating boiler ZBR..-3A
Greenstar
2
Scope of delivery
2.1
ZBR - Residential boiler for space heating and loading
of indirect fired DHW tanks
Contents of package 1:
[1]
Gas condensing boiler
1
[2]
Set of documents for appliance
[3]
Mounting bracket with mounting kit
[4]
Gas conversion kit
[5]
Adapter for connection of a LWCO
2
3
4
5
Contents of package 2:
6
[6]
Rail with connection box
[7]
Flue adapter
[8]
DHW tank temperature sensor (NTC)
7
[9]
Hydraulics connection plate with mounting kit
[10] External supply temperature sensor (NTC)
8
[11] Outdoor reset control FW 200 with mounting kit and outdoor
temperature sensor
[12] Set of documents for outdoor reset control FW 200
9
10
11
12
6 720 641 933-22.2O
1) Concentric vent kit available as accessory.
Scope of delivery | 5
1)
6 720 806 992 (2015/03)