DBS3900 (Ver.B)
Installation Guide
Figure 7-55 Installing the EMUA monitoring signal cable
1.
2.
Step 4 Route the cables by referring to
cables.
Step 5 Attach labels to the installed power cable and monitoring signal cable. For details, see Attaching
a Sign Plate Label and Attaching an L-Shaped Label.
----End
7.4.6 Installing the GPS Surge Protector
This section describes the procedure and precautions for installing the GPS surge protector and
related cables.
Context
Procedure
Step 1 Remove the two M3 screws on the panel, and then pull out the USCU, as shown in
7-56.
Issue 06 (2011-09-15)
Connect the DB9 male connector at one end of the signal cable to the wiring terminal labeled
RS-485 in left of the EMUA panel.
Connect the RJ-45 connector at the other end of the signal cable to COM OUT of the
CMUA in the cabinet.
NOTE
Only a dual-satellite receiver needs to be installed onsite.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
7 Outdoor Scenario with DC Power Supply (BBU Installed
7.5.1 Cabling Requirements
in a TMC11H)
and use cable ties to bind the
Figure
183