hit counter script

Maintenance; Maintenance Work Process - Bosch Rexroth ABZSS Operating Instructions Manual

Accumulator shut-off block
Table of Contents

Advertisement

52/64
Maintenance and repair
Bosch Rexroth AG, Accumulator shut-off block type ABZSS, 0532VAW, RE 50129-B/02.19

10.4 Maintenance

Perform maintenance at the intervals specified in the maintenance schedule of
the machine/system manufacturer.
Seals of attached and installed hydraulic components are subject to a natural
process of wear and aging. Bosch Rexroth recommends replacement at
appropriate time intervals. The intervals are mainly determined by the operating
conditions and the cleanliness of the hydraulic fluid.
As a precaution, exchange seals at reasonable time intervals.
Preventive maintenance (e.g. hydraulic fluid care) as well as compliance with the
pressure and temperature specifications extend the life cycle of the system
and/or the accumulator shut-off block.

10.4.1 Maintenance work process

Prior to maintenance, perform the following work steps:
Get the data sheets of the components to be assembled and disassembled
according to the parts list ready.
Prepare a suitable and clean tank for temporary storage of the components to be
assembled.
Prepare suitable tools.
Depressurize the system and de-energize the electrical control system.
Open the manual relief.
Close the system shut-off cock.
After maintenance, check the following points:
Make sure that the fluid ports are connected according to specifications and that
the gas port is tight and covered by the protective cap.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rexroth 0532vaw

Table of Contents