hit counter script

View Test Log - Dc Offset Verification Test - GE Vivid i n Service Manual

Hide thumbs Also See for Vivid i n:
Table of Contents

Advertisement

GE H
EALTHCARE
D
FL091021, R
IRECTION
7-3-2-2
DC Offset Verification (cont'd)
The DC Offset Verification Test commences. While the test proceeds, the name of the test currently
in progress (DC Offset Verification) is displayed in the Execute field and the current Loop # and
specific test are shown below. The messages Init Done and Please Wait are displayed beside the
progress bar in the Status area.
As the testing sequence progresses, the progress bar will advance to reflect the test progress.
Status indicators in the Data Flow map corresponding to the various system components will be
highlighted in the appropriate color to indicate the current test status, as follows:
6.) At any stage, trackball to the Pause button and press Set, if required.
7.) To resume testing (from the point where you paused), trackball to the Start button and press Set.
When the DC Offset Verification Test sequence is complete:
-
-
5
EVISION
Green: All recommended tests for these components have been completed and no problems
were identified.
Red:
Problems were identified in these components during the performance of the test.
Yellow: The tests executed so far on these components have passed, but not all
recommended tests have been performed.
the Diagnostic Test window displays the Finished message
the View Test Log window opens automatically, listing all tests performed and showing details
of which tests passed or failed, as shown in the example in
Figure 7-9 View Test Log - DC Offset Verification Test
Chapter 7 - Diagnostics/Troubleshooting
V
S
IVID I N
ERVICE
Figure
7-9.
M
ANUAL
7-19

Advertisement

Table of Contents
loading

This manual is also suitable for:

H45561acH45551deFl000110Fl000090

Table of Contents

Save PDF