Sign In
Upload
Manuals
Brands
GE Manuals
Medical Equipment
Innova 2121-IQ Biplane
GE Innova 2121-IQ Biplane Manuals
Manuals and User Guides for GE Innova 2121-IQ Biplane. We have
1
GE Innova 2121-IQ Biplane manual available for free PDF download: Preinstallation Manual
GE Innova 2121-IQ Biplane Preinstallation Manual (252 pages)
Cardiovascular Imaging System
Brand:
GE
| Category:
Medical Equipment
| Size: 35.31 MB
Table of Contents
Table of Contents
17
Chapter 1 INTRODUCTION
25
Object and Scope of this Manual
25
Responsibilities of the Purchaser/Customer
26
Pre-Installation Process
27
Chapter 2 INNOVA SYSTEM
29
Description of the System
29
Innova LC/LP Positioner
29
Innova Patient Table
29
X-Ray Generator
30
X-Ray Head
30
Innova Imaging System
31
Monitor Suspensions
31
DL and Associated Devices
31
AW Workstation Option
32
CENTRICITY CA1000 Option
32
Injectors
32
Fluoro UPS (Option)
32
Touch Screen
35
Intravascular Ultrasound (IVUS) Option
35
Application
35
Purpose
35
Product Description
35
Innova LC/LP Product Identification
37
Innova LC/LP Basic Product
37
C1 Frontal Cabinet and C1 Lateral Cabinet
39
C2 LC/LP Cabinet
40
Omega Patient Table
41
Tilt Patient Table
41
User Interface
42
Fluoro UPS (Option)
43
3Kva Cabinets UPS
45
X-Ray Tube Chiller
46
Digital Detector Conditioner
46
Innova User Area
47
IVUS Option
48
System Compatibility
50
System Compatibility Cross-Reference - Innova LC/LP Positioner/Table Sub-System
50
System Compatibilities Cross-Reference - Tables Sub-System
50
System Compatibilities Cross-Reference - Jedi X-Ray Generator Sub-System
50
System Compatibility Cross-Reference - X-Ray Head Sub-System
50
System Compatibility Cross-Reference - Innova LC/LP Imaging and X-Ray Control
50
Sub-System
50
System Compatibility Cross-Reference - Monitor Support & Suspension Sub-System
51
System Compatibilities Cross-Reference - 18" & 19" LCD Monitors Sub-System
51
Chapter 3 PHYSICAL REQUIREMENTS of ROOM
53
Presentation of the 3 Rooms
53
Examination Room
53
Technical Room
53
Control Room
53
Environmental Requirements/Limitations
54
Room Climate
54
Relative Humidity and Temperature
55
Altitude and Atmospheric Pressure
55
Equipment Heat Output (Dissipation)
56
Standard System
56
Fluoro UPS Option
58
IVUS Option
59
Environmental Limitations in Use (Room Climate)
59
Heat Output
59
IEC60601-1-2 Electromagnetic Standard Compliance & Documentation
59
General Scope
59
Electromagnetic Emission
60
Electromagnetic Immunity
60
Electromagnetic Immunity IEC 60601-1-2
61
Recommended Separation Distances for Portable and Mobile RF
62
Communications Equipment IEC 60601-1-2
62
Limitations Management
63
Use Limitation
63
Installations Requirements & Environment Control
64
Radiation Protection
65
Audible Noise
65
Windows and Curtains
65
Structural Requirements
66
Room Size
66
Elevator and Door Size Requirements
66
Door Height
66
Door Width
66
Elevator Depth
66
Floor
66
General Vascular GE Healthcare Policy
66
Floor Requirements When Using Provided Floor Anchors
67
Pan Type Floor Construction Requirement
67
Hole Dimension and Preferred Location in Concrete Floor
69
Water Pipe Requirements
71
Seismic Areas
74
Ceiling
74
LP4 Rails
74
Monitor Suspension Rails
78
Reference
78
Rail Mounting
78
Bolt Specifications
78
Rails Selection
78
Walls
78
General Requirement
78
Seismic Areas
78
Functional Requirements
79
Electrical Requirements
79
Optional Isolation Transformer Specifications
80
Room Speaker
81
Room Lighting
81
Emergency
83
Main Power Supply Cut
83
System Failure
83
Insite
84
Chapter 4 ROOM LAYOUTS
85
Room Layout Considerations
85
Service Access
85
Clinical Access
85
Peripheral Equipment
85
Emergency Stop
85
Patient Environment Equipment
86
Recommended Room Lighting
86
Preference Cabinet Locations
87
Layout Constraints
88
Room Layout Drawings
91
IVUS Option Room Layout
94
Chapter 5 PHYSICAL CHARACTERISTICS
97
Dimension Drawings
97
Mounting Requirements
124
Floor Loading and Recommended Mounting Methods
124
Positioner and Table Floor Mounting
126
Innova LC Positioner and Omega/Tilt Table Floor Preparation Kits
135
Supplied)
135
2285048 - Base Plate Assembly
136
2360538 - Tilt Table Add-On Kit
137
2285050 - Assembly and Separation Select Kit
138
2285051 - above Grade, Floor Anchors Without Insert (S18101SD)
138
2285646 - through Bolts Without Insert (S18101SH)
138
2286398 - on Grade, Floor Anchor (S18101SK)
139
2285052 - above Grade, Floor Anchor with Insert (S18101SE)
139
2285053 - through Bolts with Insert (S18101SF)
140
2285632 - Floor Plate / Base Plate Assembly (S18101SG)
141
2285056 - A/C/N Templates
141
Injector Mounting Requirements
144
Chapter 6 ELECTRICAL CONNECTIONS
145
Power Distribution
145
Power Distribution System
147
Power Distribution Box - CE
147
Power Distribution Box - UL
150
Grounding
153
Power and Grounding Recommendations
157
IVUS Rev 1 Option
159
Wiring Diagram
159
IVUS Floor Conduits
159
Run Interconnection Cables through the Conduit
160
Electrical Requirements
161
Ethernet Network Requirement
161
IVUS Rev 2 Option
163
Wiring Diagram
163
IVUS Floor Conduits
163
Run Interconnection Cables through the Conduit
164
Electrical Requirements
165
Ethernet Network Requirement
166
Ray on Lamp Distribution
167
Ready for X-Ray Lamp
168
Room Light Distribution
169
Room Speaker
170
Door Interlocks
171
Emergency
172
Partial UPS Fluoro (Option)
172
Full UPS Record (Compatability)
172
Injectors
173
Remote Injector (Rack Mount)
173
Pedestal Injector
173
Injector L.F. ILLUMINA
173
Advantage Windows
174
MAC-LAB System EX
175
MIS (Master Interconnect System)
176
Cable Channeling
177
General
177
Conduit
177
Electrical Ducts
177
Physical Runs
180
Chapter 7 ADDITIONAL PLANNING AIDS
187
Shipping Information
187
Product Shipping Information
187
Detail of Innova Shipping Information
188
Innova LC Positioner Gantry on Shipping Dolly
188
Innova LC Positioner Air Shipment
189
Innova LP4 Positioner Gantry on Shipping Dolly (Longer and Shorter Dollies)
190
Innova LP4 Positioner Stationary Rails Packaging
192
Innova C1 Frontal, C1 Lateral, and C2 LC/LP Cabinets
193
Omega Shipment
194
Power Distribution Box (PDB) CE
195
Power Distribution Box (PDB) UL
195
Other Elements Package
196
Tools and Test Equipment
197
Route Survey
199
Step One - Sketch
199
Step Two - Survey
199
Step Three - Check
199
European Process Order Select
201
Pre-Installation Checklist
202
Chapter 8 IP ADDRESSING PROCESS
205
IP Addressing Process
205
Chapter 9 SEISMIC CALCULATIONS
207
Overview
207
Calculations
208
C1 Frontal Cabinet
209
C1 Lateral Cabinet
210
C2 LC/LP Cabinet
211
Coolix 4000 Chiller
212
Thermocon Detector Chiller
214
Fluoro UPS CE Cabinet
216
Fluoro UPS UL Cabinet
218
Kva Cabinet UPS - Model 9125
220
Kva Cabinet UPS - Model 9130
222
LC Positioner
224
LP4 Positioner
228
Main Disconnect Panel (PDB - CE)
230
Main Disconnect Panel (PDB - UL)
232
Omega IV Table
234
Omega V Long Table with Baseplate
238
Omega V Long Table
242
Overhead Flat Panel Suspension - Ceiling Mounted
246
Monitor Flat Panel Suspension - Ceiling Mounted
248
Advertisement
Advertisement
Related Products
GE 2169360
GE 2169360 2169360-2
GE 2169360-3
GE 2169360-4
GE 2169360-5
GE 2169360-6
GE 2169360-7
GE 2169360-8
GE 2169360-9
GE 2169360-10
GE Categories
Refrigerator
Ranges
Microwave Oven
Air Conditioner
Dishwasher
More GE Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL