Thank you for purchasing a Sealey product. Manufactured to a high standard this product will, if used according to these instructions
and properly maintained, give you years of trouble free performance.
IMPORTANT: PLEASE READ THESE INSTRUCTIONS CAREFULLY. NOTE THE SAFE OPERATIONAL REQUIREMENTS, WARNINGS AND CAUTIONS.
USE THE PRODUCT CORRECTLY AND WITH CARE FOR THE PURPOSE FOR WHICH IT IS INTENDED. FAILURE TO DO SO MAY CAUSE DAMAGE
AND/OR PERSONAL INJURY AND WILL INVALIDATE THE WARRANTY. PLEASE KEEP INSTRUCTIONS SAFE FOR FUTURE USE.
1. SAFETY INSTRUCTIONS
WARNING! Ensure Health & Safety, local authority, and general workshop practice regulations are adhered to
when building this shed.
Keep the work area clean, uncluttered and ensure there is adequate lighting.
Keep children and unauthorised persons away from the working area.
DO NOT use the shed for any purpose other than that for which it is designed.
Use appropriate safety clothing including eye protection.
Note! The assembly of this product will require assistance.
2. INTRODUCTION
Before commencing the assembly, we recommend that you read the instructions thoroughly. Your new shed
comes with all the holes pre drilled to make for fast easy assembly. We recommend that you assemble the
shed using a trestle table or sawhorses and planks. This will ensure that you are working off the ground and
make it easier for you. Assembly is a two person job and should not be attempted in windy conditions.
Sequence of operations.
2.1
Check all parts against the component list.
2.2
Assemble the rear wall panels.
2.3
Assemble the side wall panels.
2.4
Assemble the roof panels.
2.5
Assemble the front wall panels.
2.6
Assemble door.
2.7
Fit the panels together.
2.8
Prepare and fit to plinth slab.
© Jack Sealey Limited
INSTRUCTIONS FOR:
SHED 1.5 x 0.8 x 1.9m WITH SIDE DOOR.
GSS150819SD
MODEL No:
Original Language Version
GALVANIZED STEEL
GSS150819SD
Issue: 1 - 20/08/12