Page 1
Installation instructions External motor Roof installation To prevent the risk of accidents or damage to the appliance, it is essential to read these instructions before it is installed and used for the first time. en-GB M.-Nr. 10 695 710...
This prevents both personal injury and damage to the external motor. Miele cannot be held liable for damage caused by non-compliance with these instructions. Keep these instructions in a safe place and pass them on to any future owner.
Page 4
Unauthorised installation, maintenance and repairs can cause considerable danger for the user. Installation, maintenance and repairs must only be carried out by a Miele authorised technician. A damaged external motor could be dangerous. Check the appliance for visible signs of damage. Do not use the external motor if it is damaged.
Page 5
Miele spare parts. If the electrical connection cable is faulty it must only be replaced by a Miele authorised service technician to protect the user from danger. During installation, maintenance and repair work, the appliance must be disconnected from the mains electricity supply.
Page 6
Warning and Safety instructions Using at the same time as other heating appliances that depend on the air from the room Danger of toxic fumes! Great care should be taken when using the external motor in the same room or the same area of the house as another heating appliance that depends on the air from the room.
Page 7
Warning and Safety instructions In order to ensure safe operation and to prevent gases given off by the heating appliance from being drawn back into the room, when the external motor and the heater are both operated simultaneously, an underpressure in the room of 0.04 mbar (4 Pa) is the maximum permissible.
Page 8
Warning and Safety instructions Correct installation Exhaust ducting must be of non-inflammable material. Suitable material is available from Miele specialist dealers or the Miele Spares Dept. The appliance must not be connected to a chimney or flue which is in use.
/ recycling centre for electrical and electronic appliances, or contact your dealer or Miele for advice. You are also responsible (by law, depending on country) for deleting any personal data that may be stored on the appliance being disposed of.
Installation Before installation Installation recommendations – Make sure that the installation Before installation, it is important location is easily accessible. to read the information given on the Installation work must be able to be following pages as well as the carried out without danger.
Installation AWG 102 Unscrew the 2 fixing screws on the underside of the external motor and The AWG 102 external motor is take the motor unit off of its fixing designed to be installed on an outside bracket. wall.
Page 12
Installation Make a 185 mm hole in the wall. Connect the 3 mountings through the fixing holes in the motor unit bracket as illustrated. Push the telescopic wall pipe into the hole so that it is sitting flush. The telescopic wall pipe will make it easier to feed the control cable and the flexible ducting through later on.
Page 13
Installation Connect the control cable plug connectors. Use the extension cable supplied to lengthen the connection cable if necessary. Feed the flexible ducting through the telescopic wall pipe and secure it to the collar on the motor unit fixing bracket with a hose clip.
Installation DDG 102 Please refer to the operating and installation instructions for the cooker hood before installing the external motor and ducting. The ducting collar on the motor unit has a diameter of 125 mm when the appliance is supplied. ...
Page 15
Installation Unscrew the two fixing screws and Secure the base plate to the remove the motor unit from the base mounting frame with the screws and plate. nuts supplied. Fit the three bushes supplied to the Refit the motor unit. base plate.
Page 16
Installation Remove the roofing around the Push the flexible ducting onto the installation area. connection on the motor unit and secure it with a hose clip. Bend the flashing upwards. Position the motor unit on the roof with the air outlet directed down the roof.
Installation ABLG 202 Pay particular attention to the direction of the ducting Mark the positions for the four motor base plate holes on the installation surface. Place the motor to one side. 1) Suction side The ABLG 202 external motor is designed for installation inside the house.
Page 18
Use the extension cable supplied to can be used. A telescopic wall vent kit lengthen the connection cable if is available to order from Miele or from necessary. your Miele supplier. If equipotential bonding is required, connect the earth cable to the connection point provided ...
Installation Remove the roofing around the DDF 125/150 installation area. Bend the flashing * upwards. Position the roof vent on the roof with the air outlet directed down the roof. Secure the roof vent to the roof substructure with the fixing plate.
Connection for air extraction Use smooth pipes or flexible ducting made from approved non-flammable materials for exhaust ducting. To achieve the most efficient air extraction with the lowest noise levels, please note the following: – The cross-section of the exhaust ...
Connection for air extraction Silencer Extraction mode with an external motor To achieve even further reductions in noise levels, a special silencer (optional accessory) can be fitted in the ducting system. To minimise noise from the motor in the kitchen, the silencer should be positioned in front of the external motor ...
Miele dealer or the Miele Service Department. Contact details for Miele are given at the end of this booklet. N.B. A call-out fee will be charged for service visits where the problem could have been resolved as described in these instructions.
Equipotential bonding is required in this case. The external motor is supplied with an earthed connection point . This external motor has been designed to be connected to a suitable Miele cooker hood only.
Technical data AWG 102 Total connected load 200 W Voltage, frequency AC 230 V, 50 Hz Fuse rating Control cable length 0.75 m Connection cable length Weight 14.1 kg Operating temperature down to - 20 °C Fan throughput according to EN 61591* 320 m...
Technical data ABLG 202 Total connected load 290 W Voltage, frequency AC 230 V, 50 Hz Fuse rating Connection cable length Weight 8 kg Operating temperature down to - 20 °C Fan throughput according to EN 61591* 300 m Level 1 460 m Level 2 600 m Level 3...
Technical data DDG 102 Total connected load 200 W Voltage, frequency AC 230 V, 50 Hz Fuse rating Control cable length 0.75 m Connection cable length Weight 15.2 kg Operating temperature down to - 20 °C Fan throughput according to EN 61591* 320 m Level 1 460 m...