4.4

RECTIFIERS PARALLELED ON THE SAME BATTERY

NOTE !
A parallel system with a Common Battery for two or more Rectifiers, requires a
particular installation and adequate setting of some parameters, (accessible only
through password), and can therefore only be done by a QUALIFIED ENGINEER from GE.
Usually each Rectifier-Inverter Unit runs with its own Battery.
In case of parallel units are running with a Common Battery (max. 4 UPS - see Fig 4.4-1), the sharing
circuit between individual Rectifier is integrated in the communication bus of the system in order to
assure an equal sharing of the Rectifiers output currents.
Fig. 4.4-1 Diagram RPA system with Rectifiers on Common Battery
Pay attention to the following recommendations:
The units delivered for this functioning mode needs a special parameters setting, so they must be
prepared in advance before the installation.
The installation must be performed only with the UPS system must be completely shut down.
The AC Rectifiers input power (5) must be the same, with clockwise phase rotation for each unit.
Each Rectifier must be set for the same floating DC voltage and the same Battery current limitation.
It is mandatory to install the fuses / MCCB (7) on each line connecting the Rectifiers to the common
Battery for maintenance / safety reasons.
In case one must be powered down for maintenance, switch-OFF the concerned unit before open
the DC fuses / MCCB on the Battery line (7).
It is mandatory to connect an external NO free contact "Battery Fuses" to the UPS and to enable the
function by setting the parameter (see Section 4.1 of the "Installation Guide").
If an emergency generator set supply the UPS, and the free contact "Generator ON" is connected to
the Customer interface, connect a separate NO free contact on each parallel unit.
The parameters enabling the Battery test, both manual and automatic, must be set in the same
mode on all the units having the Rectifiers on Common Battery.
Do not connect the temperature sensor for automatic battery floating voltage compensation.
Do not enable the function Boost charge (parameter 87).
Modifications reserved
OPM_SGS_USM_M22_M30_2US_V010.doc
1 –
Rectifier
2 –
Inverter
3 –
Automatic Bypass
4 –
Manual Bypass
5 –
Utility Power
6 –
Load Bus Bar
7 –
External Battery Fuse
8 –
Battery
User Manual SG Series 225 & 300 UL S2
Page 18/79

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sg seriesSg 300

Table of Contents